# M/S Geotech Promoters Pvt. Ltd., Delhi v. State of U.P. & Ors. 688 INDIAN LAW REPORTS AL

- **Citation:** (2021) 3 ILRA 687
- **Court:** High Court of Judicature at Allahabad
- **Decided:** 2021-01-29
- **Case number:** Writ-C No. 26439 of 2020
- **Bench:** Munishwar Nath Bhandari, Rohit Ranjan Agarwal
- **Source:** https://unisonlegal.in/judgment/allahabad-high-court/m-s-geotech-promoters-pvt-ltd-delhi-v-state-of-u-p-ors-688-indian-law-reports-al-46951
- **Pages:** 8

## Headnote

C.S.C., Sri Wasim Masood

A.
Real
Estate
(Regulation
and
Development) Act (16 of 2016), S. 21, S.
29, S. 30, S. 81 - Recovery Certificate
challenged on ground that single member
of RERA alone could not pass order - as S.
21 provides for formation of Authority
consist of Chairperson alongwith two
whole time Members - Held - Even single
member competent to pass order - Subsection
(2)
to
Section
29
permits
adjudication
of
complaint
even
in
absence of Chairperson - S. 30 shows
that in case of vacancy, or any defect in
the constitution of the Authority the
proceeding of the Authority would not be
invalidated
-
S.
81
provides
for
delegation of power/function, an order
was issued to delegate the power to a
Member for hearing of the complaint -
More so petitioner did not raise objection
before the single Member about his
competence to adjudicate the complaint -
petitioner
challenged
the
order
in
reference to the composition only when
he lost in the complaint (Para 8,10, 12,
13 )

B.
Real
Estate
(Regulation
and
Development) Act (16 of 2016), S. 40 (1),
S. 40 (2) - Recovery - If a promoter or an
allottee or a real estate agent, fails to pay
principal amount deposited with him,
interest
or
penalty
or
compensation
imposed on him, it shall be recoverable as
an arrears of land revenue u/s 40 (1) -
recovery of the amount is provided under
Section 40(1) alone - whereas S. 40(2) is
to enforce any direction of the nature of
restrain, injunction or to act in a particular
manner or to refrain a party in doing any
act, which cannot be enforced as an
arrears of land revenue & it is not meant
for recovery of the amount. Such order
can be enforced firstly by the Adjudicating
Authority and in case of failure, through
the civil court. (Para 19)
Complaint
filed
alleging
that
despite
payment possession of a unit not given -
prayer was made for refund of the amount
with interest - an order was passed by
RERA for refund of the principal amount of
Rs 21,42,887/- alongwith interest - RERA
issued citation for return of the principal
amount of Rs 21,42,887/- deposited with
the
Promoter
alongwith
interest
Rs
14,77,569/ - recovery of the amount was to
be made as arrears of land revenue - Order
challenged on the ground that refund of the
principal amount is not recoverable as an
arrears of land revenue u/s 40 (1) but can
be as per Section 40(2) of the Act of 2016 -

## Text

3 All. M/S Geotech Promoters Pvt. Ltd., Delhi Vs. State of U.P. & Ors.
687
Section 40 so that the object sought to be
achieved by enactment of Act of 2016 is
carried out.

21. In the instant case, the consumer
had deposited a sum of Rs.37 lacs and odd,
in instalments but despite an agreement for
giving possession of the flat in the year
2019, it was not handed over to the
consumer. The direction for return of the
amount with interest has been given in those
circumstances. If a consumer is to seek
execution of the part of the order through the
civil court then the very purpose of the
enactment of Act of 2016 to provide speedy
dispute
redressal
mechanism
would
frustrate. If the argument of the petitioner is
accepted then for recovery of a sum of Rs.
37 lacs
and odd,
the non-petitioner
consumer is to be send to civil court while
recovery of amount of interest of Rs.17 lacs
and odd can be made as arrears of land
revenue, as admitted by the counsel for the
petitioner himself. If recovery of amount is
to be sought by dividing it in two parts and
by different method, it would be against the
object of the Act of 2016. The object of
speedy redressal would frustrate if recovery
of the amount is also sought through the
civil court. We thus hold that the purpose
and object of Section 40(1) is to allow
recovery of the amount as arrears of land
revenue so as to expeditiously give the relief
to the consumer having suffered in the hands
of the Promoter. Section 40(1) has to be
given interpretation by reading down the
provision to make it purposeful and akin to
the object of the Act of 2016. Section 40(2)
is for any other direction either to act in a
particular manner or to restrain a party to do
certain act and execution of it can be made
by the Adjudicating Authority and in case of
failure, by the civil court. Section 40(2)
covers basically the case of an order of
injunction or mandatory injunction.

22. Accordingly, we are unable to
accept even the last argument raised by the
counsel for the petitioner. It would otherwise
frustrate the very object of the Act of 2016
and would give rise to the anarchy, existing
earlier, in the hands of Promoters.

23. So far as challenge to Rule 24 (a) of
U.P. Real Estate Regulatory Authority
(General) Regulation, 2019 is concerned, the
issue is kept open. It has not been debated for
the reason that an order of the nature
provided under Regulation 24 (a) has not
been passed in the case in hand. Thus, there is
no occasion for the petitioner to challenge the
vires of the said Regulation in these
proceedings However, as and when the
Authority invokes Regulation 24 (a) of
Regulation, 2019, the liberty is given to
challenge the validity. Thus, issue is kept
open for the aforesaid.

24. Thus, for all the reasons, we are
unable to accept any of the arguments raised
by the counsel for the petitioner. The writ
petition is accordingly dismissed, however,
with the liberty to avail the remedy of appeal
if other than the issue decided by us remains,
which may include the issue towards interest.
----------
(2021)03ILR A687
ORIGINAL JURISDICTION
CIVIL SIDE
DATED: ALLAHABAD 29.01.2021

BEFORE

THE HON'BLE MUNISHWAR NATH
BHANDARI, J.
THE HON'BLE ROHIT RANJAN AGARWAL, J.

Writ-C No. 26439 of 2020

M/S Geotech Promoters Pvt. Ltd., Delhi
 ...Petitioner
Versus
State of U.P. & Ors. ...Respondents
688 INDIAN LAW REPORTS ALLAHABAD SERIES
Counsel for the Petitioner:
Sri Pratik Chandra, Sri Azhar Ikram, Sri Manish
Singh

Counsel for the Respondents:
C.S.C., Sri Wasim Masood

A.
Real
Estate
(Regulation
and
Development) Act (16 of 2016), S. 21, S.
29, S. 30, S. 81 - Recovery Certificate
challenged on ground that single member
of RERA alone could not pass order - as S.
21 provides for formation of Authority
consist of Chairperson alongwith two
whole time Members - Held - Even single
member competent to pass order - Subsection
(2)
to
Section
29
permits
adjudication
of
complaint
even
in
absence of Chairperson - S. 30 shows
that in case of vacancy, or any defect in
the constitution of the Authority the
proceeding of the Authority would not be
invalidated
-
S.
81
provides
for
delegation of power/function, an order
was issued to delegate the power to a
Member for hearing of the complaint -
More so petitioner did not raise objection
before the single Member about his
competence to adjudicate the complaint -
petitioner
challenged
the
order
in
reference to the composition only when
he lost in the complaint (Para 8,10, 12,
13 )

B.
Real
Estate
(Regulation
and
Development) Act (16 of 2016), S. 40 (1),
S. 40 (2) - Recovery - If a promoter or an
allottee or a real estate agent, fails to pay
principal amount deposited with him,
interest
or
penalty
or
compensation
imposed on him, it shall be recoverable as
an arrears of land revenue u/s 40 (1) -
recovery of the amount is provided under
Section 40(1) alone - whereas S. 40(2) is
to enforce any direction of the nature of
restrain, injunction or to act in a particular
manner or to refrain a party in doing any
act, which cannot be enforced as an
arrears of land revenue & it is not meant
for recovery of the amount. Such order
can be enforced firstly by the Adjudicating
Authority and in case of failure, through
the civil court. (Para 19)
Complaint
filed
alleging
that
despite
payment possession of a unit not given -
prayer was made for refund of the amount
with interest - an order was passed by
RERA for refund of the principal amount of
Rs 21,42,887/- alongwith interest - RERA
issued citation for return of the principal
amount of Rs 21,42,887/- deposited with
the
Promoter
alongwith
interest
Rs
14,77,569/ - recovery of the amount was to
be made as arrears of land revenue - Order
challenged on the ground that refund of the
principal amount is not recoverable as an
arrears of land revenue u/s 40 (1) but can
be as per Section 40(2) of the Act of 2016 -
Held - If recovery of amount is sought by
dividing it in two parts and by different
method i.e. for recovery of principal amount
consumer is to be send to civil court while
recovery of amount of interest is made as
arrears of land revenue then it would be
against the object of the Act of 2016 of
speedy redressal (Para 21)

Dismissed

List of cases cited:-

1. M/s K.D.P. Build Well Pvt. Ltd. Vs State of
U.P. & Ors Writ -C No.2248 of 2020 dt
04.02.2020

2. Rudra Buildwell Constructions Pvt. Ltd. Vs
Poonam Sood & Anr Writ- C No.3289 of 2020 dt
06.02.2020

3. Janta Land Promoters Private Limited Vs
U.O.I. CWP No.8548 of 2020 dt 16.10.2020
(P&H)

(Delivered by Hon'ble Munishwar Nath
Bhandari, J. &
 Hon'ble Rohit Ranjan Agarwal, J.)

1. Heard Sri Manish Singh with Sri Pratik
Chandra and Sri Azhar Ikram, learned counsel
for the petitioner. Sri Wasim Masood has put in
appearance on behalf of respondents.

2. The writ petition has been filed
with the following prayers:
3 All. M/S Geotech Promoters Pvt. Ltd., Delhi Vs. State of U.P. & Ors.
689

"(i) Issue an appropriate writ, order
or direction declaring the section 24(a) of
the U.P. Real Estate Regulatory Authority
(General) Regulation, 2019 as ultra vires
and contrary to the section 21 and 85 of the
RERA Act.

(ii) Issue a writ, order or direction in
the nature of Certiorari quashing order
dated
27.8.2019
passed
Regulatory
Authority / Bench No. II, U.P. RERA
Regional Office, Gautam Budh Nagar, in
Complaint
No.
NCR144/05/0460/2019
(Narendra Nath Pandey and Jyoti Pandey
Vs. M/s Geotech Promoters Pvt. Ltd.).

(iii) Issue a writ, order or direction in
the
nature
certiorari
quashing
the
impugned
Recovery
Certificate
dated
27.2.2020 issued by opposite party no. 4.

(iv) Issue a writ, order or direction in
the nature of mandamus not to give effect
the impugned recovery certificate dated
27.2.2020 issued by opposite party no. 4.

(v) Issue a writ, order or direction in
the nature of mandamus directing the state
respondents
not
to
initiate
coercive
measures
pursuant
to
the
impugned
recovery certificate dated 27.2.2020 issued
by opposite party no. 4."

3. The petitioner has challenged the
order passed by Real Estate Regulatory
Authority
(in
short
"RERA")
dated
27.8.2019 though an appeal against the said
order lies under Section 43(5) of Real
Estate (Regulation and Development) Act,
2016 (in short "Act of 2016").

4. It is a case where a complaint was
filed by the non-petitioner alleging that
despite payment towards unit No. A-2/203
in the scheme introduced by the petitioner,
the possession of a unit has not been given.
The unit (flat) was booked on 27.11.2015
and was to be delivered in the year 2018.
The prayer was made for refund of the
amount of Rs.25,46,903/- with interest. The
Authority found that as per the agreement
entered between the parties, possession of
the flat in question should have been
delivered by 2018. The petitioner-Company
failed to show delivery of possession of the
flat
in
question.
Thus,
taking
into
consideration the default of the Promoter
(petitioner herein) and referring to the
judgment of Apex Court, an order was
passed by RERA on 27.8.2019 for refund
of the principal amount alongwith interest.
In pursuance thereof, order dated 27.8.2019
was issued for its execution. The amount of
Rs.25,46,903/- was shown towards the
principal amount while component of
interest
was
Rs.9,31,981.38/-.
The
petitioner has filed this writ petition to
challenge
not only
the
order
dated
27.8.2019 passed by RERA but the
recovery certificate dated 27.2.2020 on the
execution application.

5. Learned counsel for the petitioner
submits that an appeal against the order
passed by RERA is maintainable but this
case has exceptional circumstances thus
even a writ petition would be maintainable.
One member of RERA has passed the order
going against the Act of 2016. Section 21
provides for formation of Authority consist
of Chairperson alongwith two whole time
Members. The impugned order is by one
Member alone going against the mandate
of Section 21 of the Act of 2016. In view of
the above, there is no need to prefer an
appeal as the order dated 27.8.2019 is
without jurisdiction.

6. It is also stated that the order to
award interest by the Authority is again
going contrary to the provisions. Rules for
award of interest was introduced in the year
2018. The amount deposited with the
Promotor has been ordered to be returned
690 INDIAN LAW REPORTS ALLAHABAD SERIES
with interest. The interest has been allowed
even for the period prior to introduction of
U.P.
Real
Estate
(Regulation
and
Development) (Agreement for Sale/Lease)
Rules, 2018 (in short "Rules of 2018"). It is
even ignoring the rate of interest agreed by
the parties. Challenge to the order has been
made on that ground also.

7. We are first taking challenge to the
order dated 27.8.2019, passed by the
Authority to find out as to whether one
member was competent to pass the order.

8. The issue has been raised in
reference to Section 21 but it is not open for
debate having been decided by this Court in
Writ -C No.2248 of 2020 (M/s K.D.P. Build
Well Pvt. Ltd. vs. State of U.P. and 4 Others)
vide judgment dated 04.02.2020 and in Writ-
C No.3289 of 2020 (Rudra Buildwell
Constructions Pvt. Ltd. vs. Poonam Sood
and
Another)
vide
judgment
dated
06.02.2020 holding order by one member to
be legal. The issue regarding composition of
RERA was considered in reference to
Sections 21 and 81 of the Act of 2016.
Section 81 provides for delegation of
power/function and taking the aforesaid
provision into consideration, the argument
was not accepted.

9. At this stage, learned counsel for the
petitioner has made a reference to the
judgment of Punjab and Haryana High Court
on the same issue in Civil Writ Petition
No.8548 of 2020 (Janta Land Promoters
Private Limited vs. Union of India and
others) vide judgment dated 16.10.2020. It is
stated that judgment of this Court has been
referred by Punjab and Haryana High Court
and has taken a different view.

10. What we find is binding effect of
the judgment rendered by this Court than to
follow the judgment of other High Court.
Accordingly, we are unable to accept the
first argument in reference to Section 21 of
the Act of 2016. It is more so when the
petitioner did not raise objection before the
single Member about his competence to
adjudicate the complaint. In absence of
objection, the Authority proceeded with the
matter. If the objection would have been
taken and was sustainable, the complaint
could have been decided by the Authority
consisting of three Members. The petitioner
has challenged the order in reference to the
composition only when he lost in the
complaint.

11. It is further necessary to refer
Sections 21, 29 and 30 of the Act of 2016
to discuss the issue independent to the
earlier judgments. The provisions aforesaid
are quoted hereunder :

"21. Composition of Authority.- The
Authority shall consist of a Chairperson
and not less than two whole time Members
to be appointed by the appropriate
Government."

29. Meeting of Authority.- (1) The
Authority shall meet at such places and
times, and shall follow such rules of
procedure in regard to the transaction of
business at its meetings, (including quorum
at such meetings), as may be specified by
the regulations made by the Authority.

(2) If the Chairperson for any reason,
is unable to attend a meeting of the
Authority, any other Member chosen by the
Members present amongst themselves at
the meeting, shall preside at the meeting.

(3) All questions which come up
before any meeting of the Authority shall be
decided by a majority of votes by the
Members present and voting, and in the
event of an equality of votes, the
Chairperson or in his absence, the person
3 All. M/S Geotech Promoters Pvt. Ltd., Delhi Vs. State of U.P. & Ors.
691
presiding shall have a second or casting
vote.

(4) The questions which come up
before the Authority shall be dealt with as
expeditiously as possible and the Authority
shall dispose of the same within a period of
sixty days from the date of receipt of the
application.

Provided
that
where
any
such
application could not be disposed of within
the said period of sixty days, the Authority
shall record its reasons in writing for not
disposing of the application within that
period.

30. Vacancies, etc., not to invalidate
proceeding of Authority.- No act or
proceeding of the Authority shall be invalid
merely by reason of--

(a) any vacancy in, or any defect in the
constitution of, the Authority; or

(b) any defect in the appointment of a
person acting as a Member of the
Authority; or

(c) any irregularity in the procedure of
the Authority not affecting the merits of the
case."

12. Section 21 of Act of 2016 speaks
about composition of the Authority, which
shall consist of a Chairperson and not less
than two whole time Members to be
appointed by the appropriate Government.
Section 29, however, talks about the
meeting of Authority and perusal of subsection (2) thereof shows that in absence of
Chairperson for any reason, the other
Member chosen by the Members present
amongst themselves at the meeting, shall
preside thereby. Sub-section (2) to Section
29 permits adjudication of complaint even
in absence of Chairperson so appointed by
the appropriate Government. Thus, it is not
necessary that the adjudication of the
complaint has to be made by the
composition of Authority, as given under
Section 21 of the Act of 2016 though as per
Section 29 also, it should be by two
Members in absence of the Chairperson.

13. Section 30 of Act of 2016 is,
however, relevant and address the issue
raised in this petition. The vacancies, etc.
not to invalidate proceeding of the
Authority. It shows that in case of vacancy,
or any defect in the constitution of the
Authority or any defect in the appointment
of a person acting as a Member of the
Authority, the proceeding of the Authority
would not be invalidated. Section 30 of the
Act of 2016 give complete answer to the
objection raised by the petitioner regarding
composition of the Authority. It is not that
whatever composition given under Section
21 of the Act alone can decide the
complaint rather reference of Section 29
has been given to indicate that complaint
can be heard even in absence of the
Chairperson and, in any case, due to the
vacancy or any defect in the constitution of
Authority, the proceeding would not be
invalidated. This aspect was not brought to
the notice of Punjab and Haryana High
Court in the case of Janta Land Promoters
Private Limited (supra).

14. It is otherwise a fact that the
petitioner kept silence on the hearing of the
complaint by one Member and thereby he
cannot now be allowed and to seek
invalidation of the proceeding going
contrary to Section 30 of the Act of 2016
and his conduct. The first argument cannot
be addressed simply by referring to Section
21 of the Act of 2016 but has to be
reference
of
other
provisions,
more
specifically, Section 30 of the Act of 2016,
which was inserted by the legislature to
save the proceeding if the vacancy exist in
the Authority or other reason. It is
otherwise a fact that an order was issued to
692 INDIAN LAW REPORTS ALLAHABAD SERIES
delegate the power to a Member for hearing
of the complaint, which was considered by
this Court in earlier judgment. Thus the
first ground raised by the petitioner cannot
be
accepted.
The
resolution
of
the
Authority has also been challenged but in
the light of Section 30 of the Act of 2016,
we find no ground to set aside the
resolution as otherwise Section 81 saves it.

15. So far the second issue regarding
rate of interest is concerned, it is nothing
but a challenge on the merit of the order.
We hold writ petition for it to be not
maintainable as petitioner has remedy of
appeal.
Thus,
we
are
not
causing
interference in the order on merit but
allowing the petitioner to take remedy of
appeal, if so desires. It is after taking note
of the fact that the order of RERA is not
otherwise onerous so as to maintain a writ
petition.

16. The other challenge in the writ
petition is to execution of the order made in
reference to Section 40(1) of the Act of
2016. The recovery of the amount is to be
made as arrears of land revenue. It is stated
that recovery of interest, penalty or
compensation alone can be made as arrears
of land revenue. In the instance case,
RERA has issued citation for return of the
amount so deposited with the Promoter
with interest. The refund of the principal
amount cannot be through the process of
execution given under Section 40(1) of the
Act of 2016 but can be as per Section 40(2)
of the Act of 2016.

17. To deal with the argument
aforesaid, we are quoting Section 40 of the
Act of 2016, hereunder :

"40 Recovery of interest or penalty or
compensation and enforcement of order,
etc.- (1) If a promoter or an allottee or a
real estate agent, as the case may be, fails
to pay any interest or penalty
or
compensation imposed on him, by the
adjudicating officer or the Regulatory
Authority or the Appellate Authority, as the
case may be, under this Act or the rules
and regulations made thereunder, it shall
be recoverable from such promoter or
allottee or real estate agent, in such
manner as may be prescribed as an arrears
of land revenue.

(2) If any adjudicating officer or the
Regulatory Authority or the Appellate
Tribunal, as the case may be, issues any
order or directs any person to do any act,
or refrain from doing any act, which it is
empowered to do under this Act or the
rules or regulations made thereunder, then
in case of failure by any person to comply
with such order or direction, the same shall
be enforced, in such manner as may be
prescribed."

18. Before addressing the issue
further it would be necessary to go through
the object of the enactment i.e. as to why
the Parliament brought the Act of 2016.
The object of Act of 2016 is to protect the
interest of consumer in real estate sector
apart from others. The Bill was introduced
with the following object :

"An Act to establish the Real Estate
Regulatory Authority for regulation and
promotion of the real estate sector and to
ensure sale of plot, apartment or building,
as the case may be, or sale of real estate
project, in an efficient and transparent
manner and to protect the interest of
consumers in the real estate sector and to
establish an adjudicating mechanism for
speedy dispute redressal and also to
establish the Appellate Tribunal to hear
appeals from the decisions, directions or
3 All. M/S Geotech Promoters Pvt. Ltd., Delhi Vs. State of U.P. & Ors.
693
orders of the Real Estate Regulatory
Authority and the adjudicating officer and
for
matters
connected
therewith
or
incidental thereto."

19. A perusal of the object reveals that
the Act of 2016 has been enacted to save
interest of consumers apart from others and
thereby to regulate real estate in a proper
manner. It is even to give speedy dispute
redressal mechanism. Section 40(1) of Act of
2016 no doubt provides for mechanism for
recovery of interest, penalty or compensation.
It cannot however be ignored that recovery of
the amount is provided under Section 40(1)
alone. Section 40(2) is for execution of any
other order or direction to any person to do
any act, or refrain from doing any act, which
is not empowered to do under the Act of
2016 and in case of failure to comply,
execution can be enforced in the manner
prescribed. Sub-section (2) of Section 40 was
to enforce any direction of the nature of
restrain or injunction which cannot be
enforced as an arrears of land revenue. After
coming into the force of the rules framed by
the State of Uttar Pradesh, the matter of
execution can be taken by the Adjudicating
Authority. Sub-Section (2) of Section 40 is
not meant for recovery of the amount but for
any other direction either to act in a particular
manner or to refrain a party in doing any act.
Such order can be enforced firstly by the
Adjudicating Authority and in case of failure,
through the civil court. Rules 23 and 24 of
Uttar Pradesh Real Estate (Regulation and
Development) Rules, 2016 (in short "Rules of
2016") were brought for that purpose and
provides the machanism for execution of the
order.

20. In the light of the aforesaid, we are
required to give proper interpretation to
Section 40 so that the object sought to be
achieved by enactment of Act of 2016 is
carried out.

21. In the instant case, the consumer
had deposited a sum of Rs.25 lacs and odd,
in instalments but despite an agreement for
giving possession of the flat in the year
2018, it was not handed over to the
consumer. The direction for return of the
amount with interest has been given in those
circumstances. If a consumer is to seek
execution of the part of the order through the
civil court then the very purpose of the
enactment of Act of 2016 to provide speedy
dispute
redressal
mechanism
would
frustrate. If the argument of the petitioner is
accepted then for recovery of a sum of Rs.
25 lacs
and odd,
the non-petitioner
consumer is to be send to civil court while
recovery of amount of interest of Rs.9 lacs
and odd can be made as arrears of land
revenue, as admitted by the counsel for the
petitioner himself. If recovery of amount is
to be sought by dividing it in two parts and
by different method, it would be against the
object of the Act of 2016. The object of
speedy redressal would frustrate if recovery
of the amount is also sought through the
civil court. We thus hold that the purpose
and object of Section 40(1) is to allow
recovery of the amount as arrears of land
revenue so as to expeditiously give the relief
to the consumer having suffered in the hands
of the Promoter. Section 40(1) has to be
given interpretation by reading down the
provision to make it purposeful and akin to
the object of the Act of 2016. Section 40(2)
is for any other direction either to act in a
particular manner or to restrain a party to do
certain act and execution of it can be made
by the Adjudicating Authority and in case of
failure, by the civil court. Section 40(2)
covers basically the case of an order of
injunction or mandatory injunction.
694 INDIAN LAW REPORTS ALLAHABAD SERIES

22. Accordingly, we are unable to
accept even the last argument raised by the
counsel for the petitioner. It would
otherwise frustrate the very object of the
Act of 2016 and would give rise to the
anarchy, existing earlier, in the hands of
Promoters.

23. So far as challenge to Rule 24 (a)
of U.P. Real Estate Regulatory Authority
(General) Regulation, 2019 is concerned,
the issue is kept open. It has not been
debated for the reason that an order of the
nature provided under Regulation 24 (a)
has not been passed in the case in hand.
Thus, there is no occasion for the petitioner
to challenge the vires of the said Regulation
in these proceedings However, as and when
the Authority invokes Regulation 24 (a) of
Regulation, 2019, the liberty is given to
challenge the validity. Thus, issue is kept
open for the aforesaid.

24. Thus, for all the reasons, we are
unable to accept any of the arguments
raised by the counsel for the petitioner. The
writ petition is accordingly dismissed,
however, with the liberty to avail the
remedy of appeal if other than the issue
decided by us remains, which may include
the issue towards interest.
----------
(2021)03ILR A694
ORIGINAL JURISDICTION
CIVIL SIDE
DATED: ALLAHABAD 29.01.2021

BEFORE

THE HON'BLE MUNISHWAR NATH
BHANDARI, J.
THE HON'BLE ROHIT RANJAN AGARWAL, J.

Writ-C No. 26446 of 2020

M/S Newtech Promoters & Developers
Pvt. Ltd. Delhi ...Petitioner
Versus
State of U.P. & Ors. ...Respondents

Counsel for the Petitioner:
Sri Manish Singh, Sri Pratik Chandra, Sri Azhar
Ikram

Counsel for the Respondents:
C.S.C., Wasim Masood

A. Civil Law - Real Estate Regulation -
Real Estate (Regulation and Development)
Act, 2016 - Section 30, 40(1), 43(5) - Real
Estate
(Regulation
and
Development)
(Agreement for Sale/Lease) Rules, 2018 -
U.P. Real Estate Regulatory Authority
(General) Regulation, 2019 - Rule 24(a).

Real Estate (Regulation and Development)
Act,
2016
-
Section
21, 29,
30
-
Jurisdiction - Petitioner did not raise objection
before the single Member about his competence
to adjudicate the complaint. In absence of
objection, the Authority proceeded with the
matter. If the objection would have been taken
and was sustainable, the complaint could have
been decided by the Authority consisting of
three Members. The petitioner has challenged
the order in reference to the composition only
when he lost in the complaint. (Para 10)

It is not that whatever composition given u/s 21
of the Act alone can decide the complaint rather
reference of S. 29 has been given to indicate
that complaint can be heard even in absence of
the Chairperson and, in any case, due to the
vacancy or any defect in the constitution of
Authority,
the
proceeding
would
not
be
invalidated. (Para 13)

It is otherwise a fact that the petitioner kept
silence on the hearing of the complaint by one
Member and thereby he cannot now be allowed
and to seek invalidation of the proceeding going
contrary to S. 30 of the Act of 2016 and his
conduct.
The
first
argument
cannot
be
addressed simply by referring to S. 21 of the Act
of 2016 but has to refer to other provisions,
more specifically, S. 30 of the Act of 2016,
which was inserted by the legislature to save
the proceeding if the vacancy exist in the
Authority or other reason. It is otherwise a fact
that an order was issued to delegate the power